Work package on internal engineering systems:
- Heating system
- Individual heating point ITP
- Ventilation and Cooling system
- Fire fighting system
- Domestic water (B1,T3,T4)
- Domestic sewage (K1)
- Distribution and Electrical Boards
- Lighting system
- Fire alarm system
- Public address system
Works have been completed (October 2006ã. - March 2007ã.).
Photo gallery